All building types
  • All building types
  • clinic
  • hotel
  • industrial building
  • laboratory
  • office building
  • public building
  • residential building
  • social and medical institutions
All heating and cooling systems
  • All heating and cooling systems
  • BioClina
  • Deckenheizung und -kühlung - Putz an Gipskarton
  • floor
  • thin-layer underfloor heating system
  • wet underfloor heating system
  • ceiling
  • concrete ceiling
  • floating ceiling
  • gypsum board ceiling
  • metal ceiling
  • plaster ceiling
  • wall
  • concrete wall
  • gypsum board wall
  • plaster wall
  • room element
  • cooling roll
  • cooling column
  • GRAVIMAT
  • special design
  • surface collector
  • wall absorber
  • heat exchanger
  • facade absorber
  • ground collector
  • roof absorber
  • thermal energy storage
  • ice storage
All locations
  • All locations
  • Austria
  • Belgium
  • Bulgaria
  • Chile
  • China
  • Colombia
  • Croatia
  • Czech Republic
  • Denmark
  • Egypt
  • Finland
  • France
  • Georgia
  • Germany
  • Gibraltar
  • Greece
  • Hungary
  • India
  • Italy
  • Japan
  • Jordan
  • Latvia
  • Liechtenstein
  • Luxembourg
  • Moldova
  • Netherlands
  • Poland
  • Portugal
  • Romania
  • Russia
  • Saudi Arabia
  • Slovakia
  • Slovenia
  • South Africa
  • South Korea
  • Spain
  • Switzerland
  • Syria
  • Tunisia
  • Turkey
  • Ukraine
  • United Arab Emirates
  • United Kingdom
  • USA
Project title Building type Heating and cooling system Location Architect/Client CTM surface Year
Maschinenbau Göpfert Wiesentheid office building jointless gypsum board ceiling with OPTIPANEL 25 Germany, Wiesentheid 1.486 m² 2016
WAG Schweinfurt office building jointless drywall ceiling with CTM placed on top Germany, Schweinfurt 134 m² 2006
Sparkasse Ilmenau | Savings Bank office building metal panel Germany, Ilmenau 100 m² 1999
FH Erfurt | New Construction Auditorium & Laboratory public building, new construction jointless gypsum board ceiling with OPTIPANEL 18 Germany, Erfurt 1.371 m² 2011
Sparkassen Finanzzentrum Erfurt| Savings Bank Fin. Centre office building plaster on gypsum board, plaster on concrete Germany, Erfurt 116 m² 1999
Thüringische Aufbaubank Erfurt office building, refurbishment plaster on gypsum board, plaster on concrete Germany, Erfurt 621 m² 2002
Fromm Plastics Kölleda industrial building metal panel Germany, Kölleda 307 m² 2006
Stadtwerke Sondershausen | Municipal Utilities office building plaster on concrete Germany, Sondershausen 183 m² 2006
Umweltamt Sondershausen | Environment Agency office building, refurbishment plaster on concrete, floor heating in screed, GRAVIMAT Germany, Sondershausen 1.696 m² 2003 - 2004 & 2006 - 2007 & 2011
Energetic refurbishment Staatsarchiv Dresden | State Archives Dresden public building, refurbishment plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top Germany, Dresden

Architect: Schweger Associated Architects GmbH

803 m² 2010 - 2011
Haus am Zwinger Dresden office building, new construction jointless drywall ceiling with CTM placed on top Germany, Dresden

Architect: Heinz Tesar

804 m² 2000
Institut für Arbeit und Gesundheit IAG Dresden public building plaster on gypsum board Germany, Dresden 119 m² 2010
Institut für medizinische Genetik | University Hospital Dresden clinic, new construction plaster on gypsum board, plaster on concrete Germany, Dresden 753 m² 2008 - 2009
Klinikum Weißer Hirsch Dresden clinic plaster on concrete Germany, Dresden 265 m² 2005
New construction SFH Dresden residential building, new construction plaster on concrete, floor heating in screed Germany, Dresden 242 m² 2020 bis
Schäfer IT Systems Dresden office building metal panel Germany, Dresden 133 m² 2002
Single-family house MIK Dresden residential building plaster on concrete, floor heating onto screed, wooden or drywall subfloor Germany, Dresden 80 m² 2019
Von Ardenne GmbH Dresden | New Construction office building, new construction plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top Germany, Dresden 1.423 m² 2013 - 2014
Von Ardenne GmbH Dresden | Renovation office building, refurbishment plaster on concrete, jointless drywall ceiling with CTM placed on top Germany, Dresden 1.185 m² 2007 & 2009
Zwinger Dresden | Mathematisch-Physikalischer Salon Dresden public building, refurbishment plaster on concrete Germany, Dresden 412 m² 2011
Sparkasse Radeberg | Savings Bank office building metal panel Germany, Radeberg 350 m² 2000
Kreissparkasse Bautzen | Savings Bank office building plaster on gypsum board, plaster on concrete Germany, Bautzen 744 m² 2001
Sparkasse Bautzen |Savings Bank office building, refurbishment jointless drywall ceiling with CTM placed on top Germany, Bautzen 294 m² 2010
Kreissparkasse Löbau | Savings Bank office building plaster on gypsum board, plaster on concrete Germany, Herrenhut 125 m² 2001
Dialysezentrum Zittau | Dialysis Centre clinic, refurbishment plaster on gypsum board Germany, Zittau 272 m² 2002 & 2004
Friedrich-Fröbel-Schule Olbersdorf | School public building, refurbishment plaster on gypsum board, plaster on concrete Germany, Olbersdorf 335 m² 2010
BTU Cottbus Zentrum für Energietechnologie Cottbus public building plaster on concrete Germany, Cottbus 1.526 m² 2011 - 2012
Grassimuseum Leipzig public building, refurbishment plaster on gypsum board, plaster on concrete Germany, Leipzig 3.018 m² 2003 - 2005
Kommunale Wasserwerke Leipzig | Municipal Waterworks office building plaster on gypsum board, plaster on concrete Germany, Leipzig 157 m² 1999
Leipziger Volkszeitung office building, new construction metal panel Germany, Leipzig 185 m² 2000
Löhr's Carree Leipzig office building, new construction plaster on gypsum board, plaster on concrete Germany, Leipzig

Architect: Planungsgesellschaft Wörle Siebig

1.177 m² 1996
Refurbishment Zentralmessepalast Leipzig public building, refurbishment metal panel Germany, Leipzig 503 m² 2017
Renovation Urban Villa Leipzig office building, refurbishment jointless gypsum board ceiling with OPTIPANEL 15 Germany, Leipzig 652 m² 2008
Kraftwerk Lippendorf | Power Plant office building, refurbishment metal panel Germany, Böhlen 2.382 m² 2012 - 2013
retrofit under floor heating project JÜ Halle residential building, refurbishment floor heating onto screed, wooden or drywall subfloor Germany, Halle (Saale)

Client: private person

123 m² 2021
Carl-von-Basedow-Klinikum Merseburg clinic, refurbishment plaster on gypsum board Germany, Merseburg 309 m² 2008
BSL Schkopau office building, refurbishment metal panel Germany, Schkopau 7.151 m² 1998 - 1999
Museum Schloss Bernburg Christiansbau | Castle Museum public building, refurbishment plaster on gypsum board, floor heating in screed Germany, Bernburg

Architect: cuboidoo jüttner schwesinger architekten BDA

162 m² 2013
Town Hall Bernburg public building, refurbishment floor heating onto screed, wooden or drywall subfloor Germany, Bernburg

Architect: cuboidoo architekten BDA

370 m² 2011
New administrative building Q-Cells Thalheim office building, new construction plaster on gypsum board, plaster on concrete Germany, Thalheim/Leipzig

Architect: bhss architekten gmbh

3.606 m² 2007
Calyxo Thalheim industrial building, new construction plaster on gypsum board, brickwork, concrete Germany, Thalheim

Architect: bhss architekten gmbh

328 m² 2007
Otto Bock HealthCare GmbH Königsee office building gypsum board ceiling tile Germany, Königsee 326 m² 2011
Trade school centre Vogtland Rodewisch public building jointless drywall ceiling with CTM placed on top Germany, Rodewisch 102 m² 2003
Strabag Senftenberg office building, refurbishment , , new construction plaster on concrete Germany, Senftenberg 459 m² 2020
Paper + Design GmbH Wolkenstein office building plaster on gypsum board Germany, Wolkenstein 324 m² 2012
Hochschule Mittweida |Centre for Media and Social Science public building, new construction plaster on concrete Germany, Mittweida

Architect: Georg Bumiller Gesellschaft von Architekten mbH

1.868 m² 2013
Archiv Potsdam public building, refurbishment jointless gypsum board ceiling with OPTIPANEL 18 Germany, Potsdam 307 m² 2014
Extension Hasso-Plattner-Institute Campus 2 Potsdam public building plaster on concrete Germany, Potsdam

Architect: DGI Bauwerk Gesellschaft von Architekten mbH

Client: Hasso-Plattner-Stiftung

376 m² 2017 - 2018