| Project title | Building type | Heating and cooling system | Location | Architect/Client | CTM surface | Year | |
|---|---|---|---|---|---|---|---|
| Maschinenbau Göpfert Wiesentheid | office building | jointless gypsum board ceiling with OPTIPANEL 25 | Germany, Wiesentheid | 1.486 m² | 2016 | ||
| WAG Schweinfurt | office building | jointless drywall ceiling with CTM placed on top | Germany, Schweinfurt | 134 m² | 2006 | ||
| Sparkasse Ilmenau | Savings Bank | office building | metal panel | Germany, Ilmenau | 100 m² | 1999 | ||
| FH Erfurt | New Construction Auditorium & Laboratory | public building, new construction | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Erfurt | 1.371 m² | 2011 | ||
| Sparkassen Finanzzentrum Erfurt| Savings Bank Fin. Centre | office building | plaster on gypsum board, plaster on concrete | Germany, Erfurt | 116 m² | 1999 | ||
| Thüringische Aufbaubank Erfurt | office building, refurbishment | plaster on gypsum board, plaster on concrete | Germany, Erfurt | 621 m² | 2002 | ||
| Fromm Plastics Kölleda | industrial building | metal panel | Germany, Kölleda | 307 m² | 2006 | ||
| Stadtwerke Sondershausen | Municipal Utilities | office building | plaster on concrete | Germany, Sondershausen | 183 m² | 2006 | ||
| Umweltamt Sondershausen | Environment Agency | office building, refurbishment | plaster on concrete, floor heating in screed, GRAVIMAT | Germany, Sondershausen | 1.696 m² | 2003 - 2004 & 2006 - 2007 & 2011 | ||
| Energetic refurbishment Staatsarchiv Dresden | State Archives Dresden | public building, refurbishment | plaster on gypsum board, plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | Architect: Schweger Associated Architects GmbH |
803 m² | 2010 - 2011 | |
| Haus am Zwinger Dresden | office building, new construction | jointless drywall ceiling with CTM placed on top | Germany, Dresden | Architect: Heinz Tesar |
804 m² | 2000 | |
| Institut für Arbeit und Gesundheit IAG Dresden | public building | plaster on gypsum board | Germany, Dresden | 119 m² | 2010 | ||
| Institut für medizinische Genetik | University Hospital Dresden | clinic, new construction | plaster on gypsum board, plaster on concrete | Germany, Dresden | 753 m² | 2008 - 2009 | ||
| Klinikum Weißer Hirsch Dresden | clinic | plaster on concrete | Germany, Dresden | 265 m² | 2005 | ||
| New construction SFH Dresden | residential building, new construction | plaster on concrete, floor heating in screed | Germany, Dresden | 242 m² | 2020 bis | ||
| Schäfer IT Systems Dresden | office building | metal panel | Germany, Dresden | 133 m² | 2002 | ||
| Single-family house MIK Dresden | residential building | plaster on concrete, floor heating onto screed, wooden or drywall subfloor | Germany, Dresden | 80 m² | 2019 | ||
| Von Ardenne GmbH Dresden | New Construction | office building, new construction | plaster on concrete, plaster on gypsum board, brickwork, concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | 1.423 m² | 2013 - 2014 | ||
| Von Ardenne GmbH Dresden | Renovation | office building, refurbishment | plaster on concrete, jointless drywall ceiling with CTM placed on top | Germany, Dresden | 1.185 m² | 2007 & 2009 | ||
| Zwinger Dresden | Mathematisch-Physikalischer Salon Dresden | public building, refurbishment | plaster on concrete | Germany, Dresden | 412 m² | 2011 | ||
| Sparkasse Radeberg | Savings Bank | office building | metal panel | Germany, Radeberg | 350 m² | 2000 | ||
| Kreissparkasse Bautzen | Savings Bank | office building | plaster on gypsum board, plaster on concrete | Germany, Bautzen | 744 m² | 2001 | ||
| Sparkasse Bautzen |Savings Bank | office building, refurbishment | jointless drywall ceiling with CTM placed on top | Germany, Bautzen | 294 m² | 2010 | ||
| Kreissparkasse Löbau | Savings Bank | office building | plaster on gypsum board, plaster on concrete | Germany, Herrenhut | 125 m² | 2001 | ||
| Dialysezentrum Zittau | Dialysis Centre | clinic, refurbishment | plaster on gypsum board | Germany, Zittau | 272 m² | 2002 & 2004 | ||
| Friedrich-Fröbel-Schule Olbersdorf | School | public building, refurbishment | plaster on gypsum board, plaster on concrete | Germany, Olbersdorf | 335 m² | 2010 | ||
| BTU Cottbus Zentrum für Energietechnologie Cottbus | public building | plaster on concrete | Germany, Cottbus | 1.526 m² | 2011 - 2012 | ||
| Grassimuseum Leipzig | public building, refurbishment | plaster on gypsum board, plaster on concrete | Germany, Leipzig | 3.018 m² | 2003 - 2005 | ||
| Kommunale Wasserwerke Leipzig | Municipal Waterworks | office building | plaster on gypsum board, plaster on concrete | Germany, Leipzig | 157 m² | 1999 | ||
| Leipziger Volkszeitung | office building, new construction | metal panel | Germany, Leipzig | 185 m² | 2000 | ||
| Löhr's Carree Leipzig | office building, new construction | plaster on gypsum board, plaster on concrete | Germany, Leipzig | Architect: Planungsgesellschaft Wörle Siebig |
1.177 m² | 1996 | |
| Refurbishment Zentralmessepalast Leipzig | public building, refurbishment | metal panel | Germany, Leipzig | 503 m² | 2017 | ||
| Renovation Urban Villa Leipzig | office building, refurbishment | jointless gypsum board ceiling with OPTIPANEL 15 | Germany, Leipzig | 652 m² | 2008 | ||
| Kraftwerk Lippendorf | Power Plant | office building, refurbishment | metal panel | Germany, Böhlen | 2.382 m² | 2012 - 2013 | ||
| retrofit under floor heating project JÜ Halle | residential building, refurbishment | floor heating onto screed, wooden or drywall subfloor | Germany, Halle (Saale) | Client: private person |
123 m² | 2021 | |
| Carl-von-Basedow-Klinikum Merseburg | clinic, refurbishment | plaster on gypsum board | Germany, Merseburg | 309 m² | 2008 | ||
| BSL Schkopau | office building, refurbishment | metal panel | Germany, Schkopau | 7.151 m² | 1998 - 1999 | ||
| Museum Schloss Bernburg Christiansbau | Castle Museum | public building, refurbishment | plaster on gypsum board, floor heating in screed | Germany, Bernburg | Architect: cuboidoo jüttner schwesinger architekten BDA |
162 m² | 2013 | |
| Town Hall Bernburg | public building, refurbishment | floor heating onto screed, wooden or drywall subfloor | Germany, Bernburg | Architect: cuboidoo architekten BDA |
370 m² | 2011 | |
| New administrative building Q-Cells Thalheim | office building, new construction | plaster on gypsum board, plaster on concrete | Germany, Thalheim/Leipzig | Architect: bhss architekten gmbh |
3.606 m² | 2007 | |
| Calyxo Thalheim | industrial building, new construction | plaster on gypsum board, brickwork, concrete | Germany, Thalheim | Architect: bhss architekten gmbh |
328 m² | 2007 | |
| Otto Bock HealthCare GmbH Königsee | office building | gypsum board ceiling tile | Germany, Königsee | 326 m² | 2011 | ||
| Trade school centre Vogtland Rodewisch | public building | jointless drywall ceiling with CTM placed on top | Germany, Rodewisch | 102 m² | 2003 | ||
| Strabag Senftenberg | office building, refurbishment , , new construction | plaster on concrete | Germany, Senftenberg | 459 m² | 2020 | ||
| Paper + Design GmbH Wolkenstein | office building | plaster on gypsum board | Germany, Wolkenstein | 324 m² | 2012 | ||
| Hochschule Mittweida |Centre for Media and Social Science | public building, new construction | plaster on concrete | Germany, Mittweida | Architect: Georg Bumiller Gesellschaft von Architekten mbH |
1.868 m² | 2013 | |
| Archiv Potsdam | public building, refurbishment | jointless gypsum board ceiling with OPTIPANEL 18 | Germany, Potsdam | 307 m² | 2014 | ||
| Extension Hasso-Plattner-Institute Campus 2 Potsdam | public building | plaster on concrete | Germany, Potsdam | Architect: DGI Bauwerk Gesellschaft von Architekten mbH Client: Hasso-Plattner-Stiftung |
376 m² | 2017 - 2018 |